Pre-Painting
The buildings have been designed to allow for easy pre-painting of the components.
Sprues
Please note that some sprues or parts may vary slightly.
Ground Floor
Sort out the main frame of the store as below.
Attach a corner support and two sides of the store frame.
Repeat for the remaining sides. The small corner supports will help keep the sides in a rectangle.
Add the frame to the base.
Then add the two end decorative beams.
And finally the long decorative beams.
Roof
Start with the roof base, the gable ends and the gable support.
Glue the gable end panel support in place first.
Then attach the two gable ends.
The roof can be attached at this stage.
Attach the shorter floor support beams to the underneath of the roof first.
Then attach the longer floor support beams.
The two gable end decorative beams can be added.
Finally add the roof trims.
Finished Item