Landing Pad 38mm Leg


Pre-Painting

For the best results, the landing pad leg has been designed to be pre-painted.


Construction

Start with the bottom of the leg with parts B1 and B2 and four of part B5.

Attach the four side parts B5 to the base B1.

Then add B2 to the top.

Then add the four middle legs supports B8 to B2. Add B3 to the top.

Then add the top legs supports B8 to B3.

There are four decorative parts B6 and B7 to add to the sides of the central leg.

Attach B6 to B8 as below.

These can then be added to the central part of the leg as below.

Fianlly there are twenty heat vein parts B9 to add to the bottom of the leg.

Finished.

The leg can be added to the underneath of the platform as below.